{"id":477567,"date":"2023-08-09T09:16:45","date_gmt":"2023-08-09T09:16:45","guid":{"rendered":""},"modified":"2023-09-05T11:14:59","modified_gmt":"2023-09-05T11:14:59","slug":"incremental-build-model","status":"publish","type":"wiki","link":"https:\/\/oneproxy.pro\/tr\/wiki\/incremental-build-model\/","title":{"rendered":"Art\u0131ml\u0131 yap\u0131 modeli"},"content":{"rendered":"<p>Art\u0131ml\u0131 Yap\u0131 Modeli, \u00fcr\u00fcn\u00fcn tasarland\u0131\u011f\u0131, uyguland\u0131\u011f\u0131 ve \u00fcr\u00fcn bitene kadar art\u0131ml\u0131 olarak (k\u00fc\u00e7\u00fck par\u00e7alar halinde) test edildi\u011fi yaz\u0131l\u0131m geli\u015ftirmede kullan\u0131lan bir y\u00f6ntemdir. Hem in\u015faat hem de teslimat a\u015famalar\u0131n\u0131 i\u00e7erir ve geli\u015ftiricinin proje ilerledik\u00e7e ve teknoloji geli\u015ftik\u00e7e de\u011fi\u015fiklikler yapmas\u0131na olanak tan\u0131r.<\/p>\n<h2>Art\u0131ml\u0131 Yap\u0131 Modelinin Do\u011fu\u015fu<\/h2>\n<p>Art\u0131ml\u0131 Yap\u0131 Modeli, di\u011fer bir\u00e7ok yaz\u0131l\u0131m geli\u015ftirme modeli gibi, geli\u015ftirmede kat\u0131 bir do\u011frusal yakla\u015f\u0131m\u0131 vurgulayan geleneksel \u015eelale modelinden daha esnek ve uyarlanabilir yakla\u015f\u0131mlara duyulan ihtiya\u00e7tan do\u011fmu\u015ftur.<\/p>\n<p>Art\u0131ml\u0131 Yap\u0131 Modelinin k\u00f6keni, W. Royce&#039;un &quot;B\u00fcy\u00fck Yaz\u0131l\u0131m Sistemlerinin Geli\u015ftirilmesinin Y\u00f6netilmesi&quot; gibi literat\u00fcrdeki ilk referanslarla 1970&#039;lere kadar uzanabilir. Yaz\u0131l\u0131m teknolojisinin h\u0131zl\u0131 geli\u015fimi daha esnek geli\u015ftirme y\u00f6ntemleri gerektirdi\u011finden, Art\u0131ml\u0131 Yap\u0131 Modeli 1990&#039;larda ve 2000&#039;lerin ba\u015f\u0131nda \u00f6nemli bir ilgi g\u00f6rd\u00fc.<\/p>\n<h2>Art\u0131ml\u0131 Yap\u0131 Modeline Ayr\u0131nt\u0131l\u0131 Genel Bak\u0131\u015f<\/h2>\n<p>Art\u0131ml\u0131 Yap\u0131 Modeli, \u00fcr\u00fcn\u00fc, projenin b\u00f6l\u00fcmlerinin ayr\u0131 ayr\u0131 olu\u015fturulup test edildi\u011fi \u00e7e\u015fitli yap\u0131lara b\u00f6ler. Bu model, bir yaz\u0131l\u0131m \u00fcr\u00fcn\u00fcn\u00fcn art\u0131\u015flarla geli\u015ftirilmesini ve her art\u0131\u015f aras\u0131na geri bildirimin dahil edilmesini vurgular.<\/p>\n<p>Her art\u0131\u015f, \u00f6nceki yap\u0131ya yeni i\u015flevler ekleyerek \u00fcr\u00fcn\u00fc a\u015famal\u0131 olarak geli\u015ftirir. Bu yakla\u015f\u0131m, son derlemeden \u00f6nce test edilebilecek ve do\u011frulanabilecek yaz\u0131l\u0131m par\u00e7alar\u0131n\u0131n erken teslimine ve iyile\u015ftirilmesine olanak tan\u0131yarak riski en aza indirir ve de\u011fi\u015fikliklere yan\u0131t vermeyi kolayla\u015ft\u0131r\u0131r.<\/p>\n<h2>Art\u0131ml\u0131 Yap\u0131 Modelinin \u0130\u00e7 Yap\u0131s\u0131<\/h2>\n<p>Art\u0131ml\u0131 Yap\u0131 Modeli, gereksinimlerin toplanmas\u0131, sistem tasar\u0131m\u0131, uygulama, test etme ve bak\u0131m dahil olmak \u00fczere bir\u00e7ok a\u015famadan olu\u015fur. Ancak, Art\u0131ml\u0131 Yap\u0131 Modeli, bu a\u015famalar\u0131 do\u011frusal bir s\u0131rayla bir kez uygulamak yerine, bunlar \u00fczerinde birden fazla d\u00f6ng\u00fc veya art\u0131\u015fla yinelenir.<\/p>\n<ol>\n<li>\n<p><strong>Gereksinimlerin Toplanmas\u0131:<\/strong> Bu, yaz\u0131l\u0131m gereksinimlerinin tan\u0131mlanmas\u0131n\u0131 ve belgelenmesini i\u00e7erir.<\/p>\n<\/li>\n<li>\n<p><strong>Sistem tasar\u0131m\u0131:<\/strong> Bu a\u015fama yaz\u0131l\u0131m mimarisinin tasarlanmas\u0131n\u0131 i\u00e7erir.<\/p>\n<\/li>\n<li>\n<p><strong>Uygulama:<\/strong> Her art\u0131\u015f, \u00f6nceki art\u0131\u015f\u0131n i\u015flevselli\u011fine ek olarak tasar\u0131ma dayal\u0131 olarak geli\u015ftirilir.<\/p>\n<\/li>\n<li>\n<p><strong>Test yapmak:<\/strong> Her art\u0131\u015f, i\u015flevsellik ve mevcut sistemle uyumluluk a\u00e7\u0131s\u0131ndan test edilir.<\/p>\n<\/li>\n<li>\n<p><strong>Bak\u0131m:<\/strong> Geri bildirim ve gereksinimlerdeki de\u011fi\u015fikliklere dayanarak yaz\u0131l\u0131m\u0131n s\u00fcrekli olarak g\u00fcncellenmesi ve iyile\u015ftirilmesi s\u00fcreci.<\/p>\n<\/li>\n<\/ol>\n<h2>Art\u0131ml\u0131 Yap\u0131 Modelinin Temel \u00d6zellikleri<\/h2>\n<ol>\n<li>\n<p><strong>Yinelemeli:<\/strong> Model, her yinelemede daha fazla i\u015flevsellik eklenerek yaz\u0131l\u0131m\u0131n art\u0131\u015flar halinde olu\u015fturulmas\u0131n\u0131 vurgular.<\/p>\n<\/li>\n<li>\n<p><strong>Esnek:<\/strong> Yaz\u0131l\u0131m geli\u015ftirmenin sonraki a\u015famalar\u0131nda de\u011fi\u015fiklik ve modifikasyonlara izin verir.<\/p>\n<\/li>\n<li>\n<p><strong>Azalan Riskler:<\/strong> Erken yinelemeler, herhangi bir tasar\u0131m kusurunun belirlenmesine yard\u0131mc\u0131 olan bir prototip g\u00f6revi g\u00f6r\u00fcr.<\/p>\n<\/li>\n<li>\n<p><strong>Kullan\u0131c\u0131 geribildirimi:<\/strong> Yaz\u0131l\u0131m yap\u0131lar\u0131n\u0131n s\u0131k s\u0131k teslim edilmesi, kullan\u0131c\u0131 geri bildirimine ve do\u011frulamaya olanak tan\u0131r.<\/p>\n<\/li>\n<\/ol>\n<h2>Art\u0131ml\u0131 Yap\u0131 Modeli T\u00fcrleri<\/h2>\n<p>Art\u0131ml\u0131 Yap\u0131 Modellerinin iki ana t\u00fcr\u00fc vard\u0131r:<\/p>\n<ol>\n<li>\n<p><strong>S\u0131ral\u0131 Model:<\/strong> Bu modelde her a\u015fama ancak bir \u00f6nceki a\u015fama tamamland\u0131ktan sonra ba\u015flar. Her art\u0131\u015f, \u00f6nceki art\u0131\u015fa yeni i\u015flevler ekler.<\/p>\n<\/li>\n<li>\n<p><strong>Paralel Model:<\/strong> Bu modelde birden fazla art\u0131\u015f e\u015f zamanl\u0131 olarak geli\u015ftirilmekte ve uygulanmaktad\u0131r.<\/p>\n<\/li>\n<\/ol>\n<h2>Art\u0131ml\u0131 Yap\u0131 Modelini Uygulama: Zorluklar ve \u00c7\u00f6z\u00fcmler<\/h2>\n<p>Art\u0131ml\u0131 Yap\u0131 Modelini uygularken baz\u0131 zorluklar ortaya \u00e7\u0131kabilir:<\/p>\n<ol>\n<li>\n<p><strong>Karma\u015f\u0131k Y\u00f6netim:<\/strong> Birden fazla yap\u0131y\u0131 y\u00f6netmek zor olabilir. Etkili bir proje y\u00f6netimi arac\u0131 bu sorunu \u00e7\u00f6zebilir.<\/p>\n<\/li>\n<li>\n<p><strong>\u00c7ak\u0131\u015fan Art\u0131\u015flar:<\/strong> Paralel modeldeki art\u0131\u015flar aras\u0131nda \u00e7ak\u0131\u015fma olabilir ve bu da kar\u0131\u015f\u0131kl\u0131\u011fa yol a\u00e7abilir. A\u00e7\u0131k dok\u00fcmantasyon ve ileti\u015fim bunu \u00f6nleyebilir.<\/p>\n<\/li>\n<li>\n<p><strong>Ba\u011f\u0131ml\u0131l\u0131k Sorunlar\u0131:<\/strong> Daha sonraki art\u0131\u015flar daha \u00f6nceki art\u0131\u015flara ba\u011fl\u0131 olabilir. Planlama ve kapsaml\u0131 tasar\u0131m bu sorunu hafifletebilir.<\/p>\n<\/li>\n<\/ol>\n<h2>Benzer Modellerle Kar\u015f\u0131la\u015ft\u0131rmalar<\/h2>\n<table>\n<thead>\n<tr>\n<th>\u00d6zellik<\/th>\n<th>Art\u0131ml\u0131 Yap\u0131 Modeli<\/th>\n<th>\u015eelale Modeli<\/th>\n<th>\u00c7evik Model<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Esneklik<\/td>\n<td>Y\u00fcksek<\/td>\n<td>D\u00fc\u015f\u00fck<\/td>\n<td>Y\u00fcksek<\/td>\n<\/tr>\n<tr>\n<td>Risk y\u00f6netimi<\/td>\n<td>Orta<\/td>\n<td>Y\u00fcksek<\/td>\n<td>D\u00fc\u015f\u00fck<\/td>\n<\/tr>\n<tr>\n<td>Kullan\u0131c\u0131 Kat\u0131l\u0131m\u0131<\/td>\n<td>Orta<\/td>\n<td>D\u00fc\u015f\u00fck<\/td>\n<td>Y\u00fcksek<\/td>\n<\/tr>\n<tr>\n<td>Teslimat H\u0131z\u0131<\/td>\n<td>Orta<\/td>\n<td>Yava\u015f<\/td>\n<td>H\u0131zl\u0131<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Gelecek Perspektifleri: Art\u0131ml\u0131 Yap\u0131 Modeli<\/h2>\n<p>H\u0131zl\u0131 teknolojik ilerleme ve geli\u015fen yaz\u0131l\u0131m ihtiya\u00e7lar\u0131 ile Art\u0131ml\u0131 Yap\u0131 Modeli muhtemelen yaz\u0131l\u0131m geli\u015ftirme i\u00e7in tercih edilen bir y\u00f6ntem olmaya devam edecektir. Esnek yap\u0131s\u0131 ve yinelemeli iyile\u015ftirmeye verdi\u011fi \u00f6nem, onu dinamik teknolojik ortamlarda karma\u015f\u0131k yaz\u0131l\u0131m sistemleri geli\u015ftirmek i\u00e7in ideal k\u0131lmaktad\u0131r.<\/p>\n<h2>Proxy Sunucular\u0131 ve Art\u0131ml\u0131 Yap\u0131 Modeli<\/h2>\n<p>Art\u0131ml\u0131 Yap\u0131 Modeli, proxy sunucular\u0131n geli\u015ftirilmesinde \u00f6zellikle yararl\u0131 olabilir. OneProxy gibi sa\u011flay\u0131c\u0131lar, art\u0131ml\u0131 \u00e7al\u0131\u015farak yeni i\u015flevler ekleyebilir, bunlar\u0131 test edebilir ve bir sonraki derlemeden \u00f6nce kullan\u0131c\u0131 geri bildirimi alabilir. Bu, s\u00fcrekli iyile\u015ftirmeye ve de\u011fi\u015fen kullan\u0131c\u0131 ihtiya\u00e7lar\u0131na uyum sa\u011flamaya olanak tan\u0131r.<\/p>\n<h2>\u0130lgili Ba\u011flant\u0131lar<\/h2>\n<ol>\n<li><a href=\"http:\/\/www-scf.usc.edu\/~csci201\/lectures\/Lecture11\/royce1970.pdf\" target=\"_new\" rel=\"noopener nofollow\">B\u00fcy\u00fck Yaz\u0131l\u0131m Sistemlerinin Geli\u015ftirilmesinin Y\u00f6netilmesi<\/a><\/li>\n<li><a href=\"https:\/\/www.tatvasoft.com\/blog\/incremental-model-advantages-disadvantages-and-use-cases\/\" target=\"_new\" rel=\"noopener nofollow\">Art\u0131ml\u0131 Geli\u015ftirme Modeli: Avantajlar, Dezavantajlar ve Kullan\u0131m Durumlar\u0131<\/a><\/li>\n<li><a href=\"https:\/\/oneproxy.pro\/tr\/\" target=\"_new\" rel=\"noopener\">OneProxy<\/a><\/li>\n<\/ol>","protected":false},"featured_media":468608,"menu_order":0,"template":"","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":""},"class_list":["post-477567","wiki","type-wiki","status-publish","has-post-thumbnail","hentry"],"acf":{"faq_title":"Frequently Asked Questions about <mark>The Incremental Build Model: Enhancing the Software Development Process<\/mark>","faq_items":[{"question":"What is the Incremental Build Model in software development?","answer":"<p>The Incremental Build Model is a method used in software development where the product is designed, implemented, and tested incrementally (in small parts) until the product is finished. It involves both construction and delivery stages, allowing developers to make alterations as the project progresses and technology evolves.<\/p>"},{"question":"When and why did the Incremental Build Model originate?","answer":"<p>The Incremental Build Model can be traced back to the 1970s and gained significant traction in the 1990s and early 2000s. It evolved out of the need for more flexible and adaptable approaches than the traditional Waterfall model, which emphasizes a strict linear approach to development.<\/p>"},{"question":"What are the phases of the Incremental Build Model?","answer":"<p>The Incremental Build Model comprises multiple phases, including requirements gathering, system design, implementation, testing, and maintenance. These stages are applied iteratively in multiple cycles or increments.<\/p>"},{"question":"What are the key features of the Incremental Build Model?","answer":"<p>The key features of the Incremental Build Model include its iterative nature, flexibility, reduced risk of failure due to early prototyping and testing, and the possibility of incorporating user feedback throughout the process.<\/p>"},{"question":"What types of Incremental Build Model exist?","answer":"<p>There are two primary types of Incremental Build Models: the Sequential Model, where each phase starts only after the previous phase is complete, and the Parallel Model, where multiple increments are developed and implemented simultaneously.<\/p>"},{"question":"What challenges might arise when implementing the Incremental Build Model, and how can they be addressed?","answer":"<p>Some potential challenges include complex management of multiple builds, overlapping increments in the parallel model, and dependency issues with later increments relying on earlier ones. These challenges can be addressed with efficient project management tools, clear documentation and communication, and thorough planning and design.<\/p>"},{"question":"How does the Incremental Build Model compare to the Waterfall and Agile Models?","answer":"<p>The Incremental Build Model is more flexible than the Waterfall Model and allows for better risk management. Compared to the Agile Model, it involves less user involvement and the speed of delivery is slower.<\/p>"},{"question":"How is the Incremental Build Model useful in proxy server development?","answer":"<p>The Incremental Build Model can be useful in the development of proxy servers like OneProxy. By working incrementally, providers can add new functionalities, test them and get user feedback before the next build, allowing for continuous improvement and adaptation to changing user needs.<\/p>"}]},"_links":{"self":[{"href":"https:\/\/oneproxy.pro\/tr\/wp-json\/wp\/v2\/wiki\/477567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oneproxy.pro\/tr\/wp-json\/wp\/v2\/wiki"}],"about":[{"href":"https:\/\/oneproxy.pro\/tr\/wp-json\/wp\/v2\/types\/wiki"}],"version-history":[{"count":0,"href":"https:\/\/oneproxy.pro\/tr\/wp-json\/wp\/v2\/wiki\/477567\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oneproxy.pro\/tr\/wp-json\/wp\/v2\/media\/468608"}],"wp:attachment":[{"href":"https:\/\/oneproxy.pro\/tr\/wp-json\/wp\/v2\/media?parent=477567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}